टास्क-4.4: स्वबच्छघ भवन पर्यावरण हेतु उन्नत संवातन प्रणाली

Task – 4.4: Improved Ventilation System for Cleaner Built Environment Task Leader:-  Mr.Syed Ibrahim Sohel Objective: To study particle dynamics and effects of ventilation system on Indoor Environmental Quality (IEQ) inside a test house Modeling studies based on database generated Development of an improved ventilation system to reduce inhalable particles in the breathing zone. Scope of…

टास्क-4.3: प्रबलित कंक्रीट घटकों के प्रभाव व्यवहार का अध्ययन

Task – 4.3: Study of Impact behaviour of Reinforced Concrete Elements Task Leader:-   Dr. A.K.Mittal Objective: Experimental study of impact behaviour of RC elements by drop weight impact tests Prediction of impact behaviour of RC elements by non-linear finite element analysis. Scope of Work: RC Beam and slab elements with designed flexural and shear strengths…

टास्क-4.2: अग्नि से सुरक्षित पॉलीमेरिक कम्पोजिट पैनलों का विकास

Task – 4.2: Development of fire safe polymeric composite panels Task Leader:-  Dr. Harpal Singh Objective: To develop halogen-free fire retardant compositions for core and facing materials for making composite panels. Scope of Work: Studies and preparation of fire retardant compositions for polymeric core materials. Preparation of fire retardant compositions for facing materials. Preparation of polymeric…

टास्क-4.1: स्टील प्रबलित कंक्रीट संरचनाओं हेतु देशी कैथोडिक प्रोटेक्शन सिस्टम

Task – 4.1: Indigenous Cathodic Protection System for Steel Reinforced Concrete Structures Task Leader:-  Dr S.R. Karade Objective: To formulate procedures for designing Cathodic Protection (CP) system using indigenously available/new components for RC structures. To examine the utility of CP technology and its cost effectiveness with respect to the conventional repair methods for RCC structures To…

टास्क-3.6: डिफीकल्ट सॉयल्स के लिए रॉबस्ट नींवों का विकास

Task – 3.6: Development of Robust Foundation for Difficult Soils Task Leader:-  Dr Pradeep Kumar Objective: To identify & evaluate the significant parameters responsible for influencing the behavior of the Granular Anchor Pile (GAP) System. Development of a technology package for design of foundation in difficult (weak) soils capable of resisting Compressive & Tensile Forces based…

टास्क-3.5: विभिन्न भू-जलवायु क्षेत्रों हेतु शहरी इलाकों में सामूहिक आवासों हेतु प्रौद्योगिकी पैकेज

Task – 3.5: Technology packages for mass housing in urban areas for different geo-climatic regions Task Leader:-  Mr.Ashok Kumar Objective: Development of energy efficient, environmentally, socially & economically sustainable and affordable  mass housing. Scope of Work: Case studies of the existing housing solutions developed by various organizations and carry out qualitative and quantitative analysis of different…

टास्क-3.4: ठोस औद्योगिक अपशिष्ट- सिविल निर्माण के लिए एक भू-सामग्री संसाधन

Task – 3.4: Solid Industrial Waste – A Resource Geo- material for Civil Construction   Task Leader:-  Mr.Manojit Samanta Objectives: Strengthening of solid industrial waste deposit (Red Mud & Fly ash). Geotechnical and chemical characterization of stabilized and unstabilised solid industrial waste. Mathematical model for predicting strength and stiffness of composite material. Design guidelines for grouted…

टास्क-3.3: सोलर थर्मल एयर कंडीशनर

Task – 3.3: Solar Thermal Air Conditioner Task Leader:-  Mr.Nagesh Babu Balam Objective: To design and develop an Air- Conditioner energized by solar energy for residential buildings. Scope of the Work: Environmental chamber design & characterization of various adsorbent materials in the environmental chamber. Solar Radiation data and incident energy levels Observation of annual cooling load…

टास्क-3.2: कम लागत निर्माण के लिए कच्चे माल के रूप में विध्वंस अपशिष्टों का उपयोग

Task – 3.2: Demolition Wastes as Raw Materials for Low Cost Construction Task Leader:-  Dr. A.K. Minocha, Dr. Mridul Garg Objective: Production of recycled aggregates from demolition waste and their utilization in concrete and environmental friendly building components (bricks and tiles). Scope of the work: Preparation of recycled aggregates (RA) Analysis of properties of RA and comparison…

टास्क-3.1: कार्यालय भवनों के लिए ग्रीन रेट्रोफिट स्ट्रेटेजी़ज

Task – 3.1 : Green Retrofit Strategies for Office Buildings Task Leader:-  Ar.Ashok Kumar Objective: To develop green retrofit methodologies for existing office buildings in composite climate Scope of the work: Assessment of the existing building rating systems such as GRIHA, LEED, and BREEAM and ECBC Code and identification of Gaps. Development of an improved building…