S.No.Project TitlePI / Co-PISponsoring AgencyDuration
1Testing and Rectification Measures for Cracks in Transfer Structure Raft at Tapovan Vishnugad HPP (4x130MW)Ajay ChourasiaNTPC Ltd., 1038 TVHPP Project, Tapovan Vishnugad Hydro Power Chamoli09-2023 to 10-2025
2Structural Condition Assessment of 119 Residential Buildings of Panipat Thermal Power Station Colony Panipat HaryanaH C Arora M/s Panipat Thermal Power Station, Haryana Power Generation Corporation Limited Panipat Haryana 11-2023 to 10-2025
3Characterization of Samples by instrumental TechniquesSrinivasa Rao Naik B.Pantanjali Research Foundation, Patanjali Yoghpeeth- I, Delhi- Haridwar National Highway, Haridwar- 24940508-2017 to 08-2025
4Bio-efficacy of Fipronil 2.92 w/w E.C (W/V) against subterranean termites for its suitability through pre-construction anti-termite treatment (part-a). Bio-efficacy of Fipronil 2.92 w/w E.C (W/V) against subterranean termites for its suitability through post-construction anti-termite treatment (part-b).B. S. RawatDr. Ashish Dokras Head, Market Development& Technical Ser5vices Environmental Science, Bayer Crop Science Ltd. Bayer House, central Avenue, Hiranandani Estate, Thane (W), Mumbai-400607, Maharashtra06-2020 to 05-2025
5S&T Interventions for buildings, Area Development and Landscaping Work at NTPC-Tapovan Vishnugad Hydro Electric ProjectAshish PippalNTPC LTD, Tapovan Vishnugad HPP Ravigram Joshimath, Uttarakhand04-2023 to 03-2025
6Performance evaluation of AAC Panel and Prefabricated volumetric Reinforced Concrete Modular BuildingAjay ChourasiaPresident, Magicrete building solution Pvt. Ltd. 101-102, Ritz Square, Athwa Surat 39500204-2022 to 03-2025
7Supervision of painting work & performance evaluation of IPNet paints to be used in the painting of MRTS projects for Southern Railways at St. Thomas Mount, ChennaiP.C. ThapliyalM/s C.S. Rao Infra Projects No 57, Flat B- Virdi residency 30th Street, Thangam Colony- H Block Anna Nagar, Chennai03-2024 to 02-2025
8Detailed Condition Assessment of Transfer point 1 to 10 and Conveyor Galleries to suggest remedial measures at Coal Handling of PBCMP NTPC Sikri, HazaribaghAjay ChourasiaNTPC LTD BARWADIH/KERENDARI/CHATTI BARIATU, NTPC LTD., Pakri Barwadih Coal Mining Project ,FLOOR NO.-2 , HAZARIBAGH, Jharkhand12-2022 to 12-2024
9Bio-efficacy and persistence evaluation of Isocycloseram 200 SC for subterranean termite management in buildingsB. S. RawatPreeti Agarwal, Syngenta India Ltd., Unit No. 405, Fourth Floor, D-2, Southern Park, District Center, Saket, New Delhi-11001701-2023 to 12-2024
10Vetting of Structural Design and Drawings for Construction of Satellites Center for All India Institute of Medical Sciences (AIIMS) Rishikesh at Udham Singh Nagar, UttarakhandSiddharth BeheraM/s NCC Limited Vill.- Khurpia Farms Kicha, Pargana - Rudrapur Thaseel- Kicha Distt.- Udham Singh Nagar, Uttarakhand 01-2024 to 12-2024
11Vetting of the Structural and ground improvement measures for the distressed passenger cum station building in Nischintapur Yard, Akhaura, AgartalaAnindya PainM/s IRCON International Ltd., Agartala - Akhaura New Rail link project, Agartala RLY Station Office Complex, First Floor, Running room, P.O Siddhi Ashram, Distt. Badarghat West Tripura01-2024 to 12-2024
12S&T Intervention for enhancement of landslide related technical know how of engineers of TATA Steel LimitedAshish PippalM/s Tata Steel Limited SNTI N Road, Bistupur, Jamshedpur01-2024 to 12-2024
13Structural Assessment of 13 Story Hostel Building (H1) at IIM. AmritsarSiddharth BeheraM/s NKG Iinfrastructure Limited 204 Kailash Building, 26 K.G. Marg, 12-2023 to 11-2024
14Vetting of HVAC, Plumbing and Fire Drawings of Campus of ECHS HospitalShorab JainM/s Kamal Associates Plot No.1, LSC Market, 3rd Floor, Payur Vihar Phase II, Delhi12-2023 to 11-2024
15Investigation and Suggestion on remedial measures of water ingress problem in the underground tunnel area of ERH-1 & 2 at Rajiv Gandhi Thermal Power Plant, Khedar, Hissar, HaryanaManojit SamantaM/s RGTPP, HPGCL, Khedar, Hissar02-2024 to 11-2024
16Design Assessment of BCIS Pile Foundation of Indore Metro Rail ProjectM. VinothURC Construction (P) Ltd., Super Corridor, Palakhedi Village, Malarganj Taluk, Indore07-2023 to 07-2024
17Design Checking for 120 feet Timber Flagpost at Rashtrapati Nilayam, HyderabadSiddharth BeheraM/s RBG-EKN & Rajasthan, NBCC (India) Limited Ground Floor, Tower No.4, Office block, Along Ring Road, East Kidwai Nagar, New Delhi12-2023 to 07-2024
18Development of CO2 sequestered engineered aggregates from fly ash and industrial wastesHumaira AtharNTPC Ltd., EOC Noida Office, EOC, Sector-24, Noida11-2022 to 07-2024
19Subsurface investigation, analysis of foundation schemes, site-specific ground response analysis and monitoring of Shri Ram Temple at Ayodhya UP.Manojit SamantaK Veerappan Vice President & Head EDRC-B&F IC L&T Construction Campus 1 Floor, Left Wing, AR Centre PB No-979, Mount Poonamallee Road Manapakkam, Chennai Pin-60008912-2021 to 06-2024
20Characterisation of Manufactured Sand and its Effective Utilization in construction.S. K. SinghChief General Manager (R&D) NBCC (India) Limited NBCC Bhawan Lodhi Road New Delhi- 110002 India05-2018 to 06-2024