S.No. | Project Title | PI / Co-PI | Sponsoring Agency | Duration |
1 | Testing and Rectification Measures for Cracks in Transfer Structure Raft at Tapovan Vishnugad HPP (4x130MW) | Ajay Chourasia | NTPC Ltd., 1038 TVHPP Project, Tapovan Vishnugad Hydro Power Chamoli | 09-2023 to 10-2025 |
2 | Structural Condition Assessment of 119 Residential Buildings of Panipat Thermal Power Station Colony Panipat Haryana | H C Arora | M/s Panipat Thermal Power Station, Haryana Power Generation Corporation Limited Panipat Haryana | 11-2023 to 10-2025 |
3 | Characterization of Samples by instrumental Techniques | Srinivasa Rao Naik B. | Pantanjali Research Foundation, Patanjali Yoghpeeth- I, Delhi- Haridwar National Highway, Haridwar- 249405 | 08-2017 to 08-2025 |
4 | Bio-efficacy of Fipronil 2.92 w/w E.C (W/V) against subterranean termites for its suitability through pre-construction anti-termite treatment (part-a). Bio-efficacy of Fipronil 2.92 w/w E.C (W/V) against subterranean termites for its suitability through post-construction anti-termite treatment (part-b). | B. S. Rawat | Dr. Ashish Dokras Head, Market Development& Technical Ser5vices Environmental Science, Bayer Crop Science Ltd. Bayer House, central Avenue, Hiranandani Estate, Thane (W), Mumbai-400607, Maharashtra | 06-2020 to 05-2025 |
5 | S&T Interventions for buildings, Area Development and Landscaping Work at NTPC-Tapovan Vishnugad Hydro Electric Project | Ashish Pippal | NTPC LTD, Tapovan Vishnugad HPP Ravigram Joshimath, Uttarakhand | 04-2023 to 03-2025 |
6 | Performance evaluation of AAC Panel and Prefabricated volumetric Reinforced Concrete Modular Building | Ajay Chourasia | President, Magicrete building solution Pvt. Ltd. 101-102, Ritz Square, Athwa Surat 395002 | 04-2022 to 03-2025 |
7 | Supervision of painting work & performance evaluation of IPNet paints to be used in the painting of MRTS projects for Southern Railways at St. Thomas Mount, Chennai | P.C. Thapliyal | M/s C.S. Rao Infra Projects No 57, Flat B- Virdi residency 30th Street, Thangam Colony- H Block Anna Nagar, Chennai | 03-2024 to 02-2025 |
8 | Detailed Condition Assessment of Transfer point 1 to 10 and Conveyor Galleries to suggest remedial measures at Coal Handling of PBCMP NTPC Sikri, Hazaribagh | Ajay Chourasia | NTPC LTD BARWADIH/KERENDARI/CHATTI BARIATU, NTPC LTD., Pakri Barwadih Coal Mining Project ,FLOOR NO.-2 , HAZARIBAGH, Jharkhand | 12-2022 to 12-2024 |
9 | Bio-efficacy and persistence evaluation of Isocycloseram 200 SC for subterranean termite management in buildings | B. S. Rawat | Preeti Agarwal, Syngenta India Ltd., Unit No. 405, Fourth Floor, D-2, Southern Park, District Center, Saket, New Delhi-110017 | 01-2023 to 12-2024 |
10 | Vetting of Structural Design and Drawings for Construction of Satellites Center for All India Institute of Medical Sciences (AIIMS) Rishikesh at Udham Singh Nagar, Uttarakhand | Siddharth Behera | M/s NCC Limited Vill.- Khurpia Farms Kicha, Pargana - Rudrapur Thaseel- Kicha Distt.- Udham Singh Nagar, Uttarakhand | 01-2024 to 12-2024 |
11 | Vetting of the Structural and ground improvement measures for the distressed passenger cum station building in Nischintapur Yard, Akhaura, Agartala | Anindya Pain | M/s IRCON International Ltd., Agartala - Akhaura New Rail link project, Agartala RLY Station Office Complex, First Floor, Running room, P.O Siddhi Ashram, Distt. Badarghat West Tripura | 01-2024 to 12-2024 |
12 | S&T Intervention for enhancement of landslide related technical know how of engineers of TATA Steel Limited | Ashish Pippal | M/s Tata Steel Limited SNTI N Road, Bistupur, Jamshedpur | 01-2024 to 12-2024 |
13 | Structural Assessment of 13 Story Hostel Building (H1) at IIM. Amritsar | Siddharth Behera | M/s NKG Iinfrastructure Limited 204 Kailash Building, 26 K.G. Marg, | 12-2023 to 11-2024 |
14 | Vetting of HVAC, Plumbing and Fire Drawings of Campus of ECHS Hospital | Shorab Jain | M/s Kamal Associates Plot No.1, LSC Market, 3rd Floor, Payur Vihar Phase II, Delhi | 12-2023 to 11-2024 |
15 | Investigation and Suggestion on remedial measures of water ingress problem in the underground tunnel area of ERH-1 & 2 at Rajiv Gandhi Thermal Power Plant, Khedar, Hissar, Haryana | Manojit Samanta | M/s RGTPP, HPGCL, Khedar, Hissar | 02-2024 to 11-2024 |
16 | Design Assessment of BCIS Pile Foundation of Indore Metro Rail Project | M. Vinoth | URC Construction (P) Ltd., Super Corridor, Palakhedi Village, Malarganj Taluk, Indore | 07-2023 to 07-2024 |
17 | Design Checking for 120 feet Timber Flagpost at Rashtrapati Nilayam, Hyderabad | Siddharth Behera | M/s RBG-EKN & Rajasthan, NBCC (India) Limited Ground Floor, Tower No.4, Office block, Along Ring Road, East Kidwai Nagar, New Delhi | 12-2023 to 07-2024 |
18 | Development of CO2 sequestered engineered aggregates from fly ash and industrial wastes | Humaira Athar | NTPC Ltd., EOC Noida Office, EOC, Sector-24, Noida | 11-2022 to 07-2024 |
19 | Subsurface investigation, analysis of foundation schemes, site-specific ground response analysis and monitoring of Shri Ram Temple at Ayodhya UP. | Manojit Samanta | K Veerappan Vice President & Head EDRC-B&F IC L&T Construction Campus 1 Floor, Left Wing, AR Centre PB No-979, Mount Poonamallee Road Manapakkam, Chennai Pin-600089 | 12-2021 to 06-2024 |
20 | Characterisation of Manufactured Sand and its Effective Utilization in construction. | S. K. Singh | Chief General Manager (R&D) NBCC (India) Limited NBCC Bhawan Lodhi Road New Delhi- 110002 India | 05-2018 to 06-2024 |