| S.No. | Project Title | PI / Co-PI | Sponsoring Agency | Duration |
| 1 | Development of Fire Resistance Protective Layer for Reinforced Concrete Strcutural Elements for Building Applications | Nawal Kishore Banjara | M/s Stanvac Chemicals Inida Ltd. 551, Sector 37 Pace City-II Gurugram Haryana-122001 | 10-2025 to 10-2027 |
| 2 | Reaction to Fire behavior of ACM façade of Mitsubishi Chemical Infratec Co., Ltd. | Shorab Jain | Yoshihiro Hase & Yuji Kawamoto ALPOLIC Busines Unit Planning Department Mitsubishi Chemical Infratec Co. Ltd. 1-1-1, Marunouchi, Chiyoda-ku, Tokyo, 100-8251 Japan | 10-2025 to 05-2027 |
| 3 | Development of Fire Stop Barrier with up to 4-Hour Fire Rating | Shorab Jain | M/s Stanvac Chemicals India Ltd., 551, Sector 37 Pace City-II, Gurugram, Haryana | 09-2025 to 03-2026 |
| 4 | Structural Performance evaluation of RC Elements Reinforced with SmartFAB Welded Wire Mesh | Kishor S Kulkarni | M/s Tata Steel Limited , 14th Floor, Tata Centre, Kolkata-700071 | 09-2025 to 09-2026 |
| 5 | Condition Assessment and Suggestions of Remedial Measures for Distresses in Purvanchal Royal Park, Noida | Harish Chandra Arora | Purvanchal Royal Park Apartment Owners Association Gh-04, Sector-137, Noida | 07-2025 to 02-2027 |
| 6 | Analyse & Study the Vibrations and Remedial Measures (If Any) at Millennium City Centre, Gurugram (MCC) Station on Line-02 of Delhi Metro Rail Corporation Limited (DMRC) | M M Ansari | Delhi Metro Rail Corporation Limited (DMRC), B.N. Chaturvedi DY CE/C&S-VI, DMRC | 08-2025 to 10-2026 |
| 7 | Performance evaluation of Crystalline Waterproofing Compound AquaArm C35 P of MYK ARMENT as per CPWD Specifications | S. K. Singh | M/s MYK Arment Private Limited, Plot No 30/C Sy no 83/1, 17, Hyderabad | 08-2025 to 07-2026 |
| 8 | Studies of PU Foam Adhesive Material for Benchmarking the Mechanical Performance for Structural Applications | Rajesh Kumar | M/s Concrete Works Construction Chemicals Private Limited, Office No. F 4, 4th Floor, DB House, Madhavnagar Road, Sangli Maharashtra | 08-2025 to 07-2026 |
| 9 | Integrated Geo-Environmental Assessment and Planning for Safe Development of Bulk Drug Park, UNA District, Himachal Pradesh | Anindya Pain | Himachal Pradesh Bulk Drug Park Infrastructure Limited | 08-2025 to 06-2026 |
| 10 | Structural Safety Audit of School Buildings Under Alankar Scheme at District Ghaziabad and District Gautam Buddha Nagar, UP | Harish Chandra Arora | U.P. Projects Corporation Ltd., Unit-36, Noida K2, Sector-116 Noida | 07-2025 to 06-2026 |
| 11 | Suggestions on the Repair Methadology for Water Ingress Problem of Underpass At Dwarka Expressway, New Delhi | Manojit Samanta | M/s Larsen & Tourbo Limited, Dwarka Expressway, Project,Sector 110A-111, Village and Post Office-Bajgheda-122017 | 06-2025 to 11-2025 |
| 12 | To Study the effect of Crystalline Admixture on the Physico-Mechanical, Microstructural, and Durability Properties of Concrete | Rajesh Kumar | M/s Pidilite Industries Limited, Kondivita Depot, Andheri-East, Mumbai, Ramkrishna Mandir Road, Kodivita Village, Mumbai Maharashtra, India 400059 | 05-2025 to 04-2027 |
| 13 | Development of Composite Plaster using Mineral Additives & FGD Waste from Desulphurisation Plant | Neeraj Jain | M/s Hindalco Industry Limited, Mahan Unit Bargawan Singrauli, Madhya Pradesh | 01-2025 to 12-2025 |
| 14 | Development of Low Carbon Composite Cement Using Performance- Improved Thermo-Mechanical Activated Pozzolanic Red Mud for Sustainable Development | Rajesh Kumar | M/s Vedanta Lanjigarh, Odisha, India - 766027 | 12-2024 to 12-2025 |
| 15 | Performance of TermiPore reticulate pipe system to install for pre and post anti-termite treatment in buildings | Rajesh Kumar Verma | M/s Pranav Plastic Products, S-642, Kalali Road, Near Transpek Silox Atladra, Vadodara | 10-2024 to 07-2026 |
| 16 | Subsurface investigation, analysis of foundation schemes, site-specific ground response analysis and monitoring of Shri Ram Temple at Ayodhya UP. | Manojit Samanta | K Veerappan Vice President & Head EDRC-B&F IC L&T Construction Campus 1 Floor, Left Wing, AR Centre PB No-979, Mount Poonamallee Road Manapakkam, Chennai Pin-600089 | 12-2021 to 12-2025 |
| 17 | Technical guidance on the safe demolition of Supertech Twin Tower, Noida | D. P. Kanungo | Supertech Ltd, E-Square, Plot No. C2, Sector 96, Noida, UP-201303 | 08-2022 to 12-2025 |
| 18 | Third Party Quality Assurance Services for the Construction of Thal Sena Bhawan at Delhi Cantt. | I.A. Siddique | ITD Cementation India Limited, 301-302, 3rd Floor, Janakpuri, Delhi | 06-2023 to 11-2025 |
| 19 | Geotechnical and Structural Stability Investigation of RCC Hot Water Tunnel, Unit 6 of M/s HPGCL, Panipat, Haryana | Manojit Samanta | M/s HPGCL, PTPS Panipat, Haryana, 132105, India | 02-2025 to 07-2026 |
| 20 | Structural Assessment and Evaluation of Murfor Compact(A) Under out of plane loading and its Comparison with RCC Band | Chanchal Sonkar | M/s Biltech Building Elements Ltd. (BBEL), Ltd. New Delhi | 06-2024 to 12-2025 |