Last Updated on April 29, 2023
S.No. | Project Title | PI / Co-PI | Sponsoring Agency | Duration |
1 | Bio-Efficacy studies of Fipronil 2.92 w/w E.C. (w/v) against subterranean termites foe its suitability through pre-construction anti-termite treatment | B.S.Rawat | M/s Bayer CropSecience Ltd. Mayer House Central Avenue, Hiranadani Estate, Thane west, Mumbai-400076 | 01-06-2020 to 31-05-2025 |
2 | Design and Demonstration of Mechanism for the Surya Teelak of Shri Ram Mandir at Ayodhya | S. K. Panigrahi | Sri Ram Janmbhoomi Teerth Kshetra Trust, Ayodhya | 01-03-2023 to 28-02-2025 |
3 | Bio-efficacy and Persistence Evaluation of Isocycloseram 400 SC for Subterranean Termite Management in Buildings | B. S. Rawat | M/s Syngenta India Pvt. Ltd., Amar Paradigm, Survey No. 110/11/3, Baner Road, Pune | 01-01-2023 to 31-12-2024 |
4 | Structural Audit of residential Towers (D, E, F, G & H) of Phase-I of Group Housing Project, Chintels Paradiso, Sector-109, Gurugram, Haryana | Debdutta Ghosh | Manager - Contracts & Planning, Chintels India Pvt. Ltd., Gurgaon | 01-02-2023 to 31-07-2024 |
5 | Sustainable Development of Bricks / Blocks from Glass Wool Wastes | S. K. Singh | Ms UP Twiga Fiberglass Ltd., 9, SIA, Sikandrabad, Dist. Bulandshahr | 01-11-2022 to 31-05-2024 |
6 | Performance Evaluation of Geo-spray (Geopolymer Mortar) in Bond Test with Brick against the ASTM C1583 standard | S. K. Singh | M/s Deogourdi Engg. & Infra Solution Pvt. Ltd., 205, 2nd Floor, 4262/3, Ansari Road, Dariyaganj, New Delhi | 01-02-2023 to 31-05-2024 |
7 | Technical guidance on the safe demolition of Supertech Twin Tower, Noida | D. P. Kanungo | M/s Supertech Ltd, E-Square, Plot No. C2, Sector 96, Noida | 24-08-2022 to 21-05-2024 |
8 | 3-D Structural Analysis and Suggestion Design Modifications of Proposed Shri Ram Mandir,Ayodhya. | Debdutta Ghosh | Ms CB Sompura ,404,shilp Arcade ,Opposite Ratnamani Tower ,Jodhpur Cross Road, Satellite,Ahmedabad,Gujrat-380015 | 01-11-2021 to 30-04-2024 |
9 | Technical Review of Projects under Ujjain Smart City Ltd. | A. K. Mittal | Chief Executive Officer, Ujjain Smart City Ltd., Mela Karyalay, Kothi Palace, Ujjain | 01-11-2022 to 29-02-2024 |
10 | Fire Performance Evaluation of UPVC Profiles | A. Aravind Kumar | M/s DCM Shriram Ltd., Unit-Fenesta Building Systems, E1219-1222, Phase 1, RIICO Industrial Area, Ghatal, Bhiwadi | 01-01-2023 to 31-01-2024 |
11 | Health Assessment of Samadhi Temple of Baba Neeb Karori Ashram at Vrindavan, District Mathura, Uttar Pradesh | H. C. Arora | Sh. Thakur Hanuman Ji Trust, Baba Neeb Karori Ashram, Parikrama Marg, Vrindavan, Mathura | 01-04-2023 to 31-10-2023 |
12 | Development of Master Plan for Shri Mansa Devi Complex, Panchkula | S. K. Negi | Shri Mata Mansa Devi Shrine Board, Panchkula | 01-09-2022 to 30-09-2023 |
13 | Performance Evaluation of Crystalline Waterproofing Admixture for the Work-Improvement to Rengali Dam under DRIP Phase-II & III | S. K. Singh | M/s Balaji Drillers and Engineers-Rakesh Kumar JV, Khetrajpur, Sambalpur | 01-03-2023 to 31-08-2023 |
14 | Fire Performance Evaluation of Natural Stone (Quartzite) | A. Aravind Kumar | M/s Serendipity Arts, Plot No. 2, Institutional Area, Vasant Kunj, Phase-II, South-West Delhi, Delhi | 01-03-2023 to 31-08-2023 |
15 | Development of high volume of Fly Ash- Gypsum composite plaster for interior applications. | Neeraj Jain | Gopal Sharma SR. DGM- Commercial MSP Steel& Power LTD PO & VILL. Jamgaon, Raigarh Chhattisgarh | 01-05-2022 to 31-07-2023 |
16 | Subsurface investigation, analysis of foundation schemes, site-specific ground response analysis and monitoring of Shri Ram Temple at Ayodhya UP. | Manojit Samanta | K Veerappan Vice President & Head EDRC-B&F IC L&T Construction Campus 1 Floor, Left Wing, AR Centre PB No-979, Mount Poonamallee Road Manapakkam, Chennai Pin-600089, | 01-12-2021 to 30-06-2023 |
17 | Studies on Mechanical and Durability Properties of Normal and High Strength Concrete with Graphene | R. Siva Chidambaram | M/s Reliance Industries Ltd., Reliance Corporate Park, 5 TTC Industrial Area, Thane-Belapur Road, Ghansoli, Navi Mumbai | 01-09-2022 to 30-06-2023 |
18 | Review of MEPF Design of proposed Hospital & Teaching block of Dr.Y.S. Parmar Medical College, at Nahan(HP). | Shorab Jain | Akhilesh Mathur Additional General Manager Architecture Design center Shapoorji Pallonji Co Pvt Ltd 3 rd floor, Videocon Tower Jhandewalan Extension New Delhi 110055 | 01-02-2022 to 30-06-2023 |
19 | Fire Performance Evaluation of uPVC window profiles | A. Aravind Kumar | M/s Saint Gobain India Pvt. Ltd. (SGIPL) - Research & Development, IIT Madras Research Park, No. 1FA, Phase-II, Block C, Kanagam Road, Taramani, Chennai | 01-10-2022 to 03-06-2023 |
20 | Stack monitoring of high draught brick kilns and determinitation of pollution load in Dist. Jhajjar, Haryana | Neeraj Jain | Bhagat Singh BKO Vill. Pelpal , Distt. Jhajjar-124105 | 01-06-2022 to 30-04-2023 |