S. No.Project TitlePI / Co-PISponsoring AgencyDuration
1Fire Safety Audit of Dr. RML HospitalShorab JainDirector & Medical Superintendent, ABVIMS and Dr. RML Hospital, New Delhi04-2025 to 03-2029
2Technical Textiles as Sustainable Building Materials for Various Structural, and Geotechnical Applications in Construction R. Siva ChidambaramJoint Mission Director (RD & I), NTTM, Ministry of Textiles, New Delhi01-2025 to 09-2027
3Establishment of a center of innovation and manufacturing eco-system in industrial IOT vertical-3: smart structure and structural health monitoring (CBRI Part).S. K. PanigrahiCoordinating Lab: CSIR-CGCRI, Kolkata Dr Somnath Bandyopadhyay, Chief Scientist, CSIR-CGCRI, Kolkata (W.B)04-2022 to 03-2027
4Third Party Quality Assurances (Civil, E&M, Horticulture, Civil & MEP Services and Development Work) and Technical Advice for the work of "Design, Construction, Testing and Commissioning of Office Building with Data Center for Punjab National Bank (excluding Data Centre Work) at Plot No.-84, Sector-18, GurugramS.K. SinghM/s Executive Engineer & Sr Manager & Senior Manager ( C), Gurugram Project Division, CPWD, Pilot No. 84, Sector-18, Gurugram03-2024 to 02-2027
5TPQC and Monitoring of Construction of Central University og Gujarat (CUG) Permanent Campus (Phase-II) at Vadodara SH: Construction of Residential Quarters, Hostels etc.S. K. SinghExecutive Engineer & Sr Manager, CUG Project Division, Gram Khandela, Vadodra, Gujarat11-2023 to 10-2026
6Mainstreaming passive solar heated buildings in Indian Himalayan region: Integrating science with traditional practices to enhance climate resilienceNagesh Babu BalamNational Mission on Himalayan Studies, Scientist-E, Centre for Land & Water Resources Management (CLWRM) GBPNIHE, Kosi-Katarmal, Almora, Uttarakhand08-2023 to 08-2026
7Structural Safety Audit of 34 nos. Eklavya Model Residential Schools (EMRSs),S. K. NegiM/s NESTS, Jeevan Tara Building, New Delhi 07-2024 to 06-2026
8Monitoring, and Assessment of Ground Vibration and Building Distress due to Adjacent Tunneling Work at Village Palli, UttarakhandManojit SamantaM/s UJVNL Lakhwar MPP Dakpatthar, Dehradun12-2024 to 06-2026
9Technical Advice & TPQA of Construction of 100 Bedded ESIC Hospital & 32 Nos. of Staff Quarters with Boundary Walls including Horticulture & all other related services at Bahadurgarh, HaryanaS. K. SinghEx. Engineer, CPWD, NDRI Campus, Near SBI Karnal-132001 Haryana04-2023 to 03-2026
10Creation of Centre of Excellence on Conservation of Indian Heritage Structures at CSIR-CBRI RoorkeeDebdutta GhoshDepartment of Science & Technology, Ministry of Science & Technology, Technology Bhavan, New Mehrauli Road, New Delhi-11001601-2021 to 01-2026
11Structural Audit of residential towers of Phase II (A,B,C and J) of Chintels Paradiso, Sector-109, Gurugram, A residential Project of M/s Chintels India Private LimitedDebdutta GhoshG Venkateshwara Rao Manager- Contracts & Planning01-2024 to 01-2026
12Distress diagnosis and suggestions for rehabilitation measures of Dwarka Court building.H. C. AroraExecutive Engineer PWD, B-6, NCC Building Safdarjang Enclave, New Delhi- 11002902-2020 to 12-2025
13Rehabilitation of Heritage Structure and Quality Assessment of Ongoing RCC Structures Construction Work in the Mahakaleshwar Temple ComplexAjay ChourasiaShree Mahakaleshwar Mandir Prabandh Samitee, Ujjain 01-2025 to 12-2025
14Special Inspection/ Audit of Civil, Electrical, Fire Services Work of New Parliament Building at Plot- 118, Parliament House Estate, New Delhi-110001S.K. SinghCentral Vista Project Division-I CPWD New Delhi 12-2024 to 12-2025
15Study on Improvement in Rates and Ratios in Estimation of Gross Value Added Construction for Nagaland State of IndiaKishore S KulkarniDirectorate of Economic and Statistics Nagaland Information Commission Government of Nagaland, Kohima12-2024 to 12-2025
16Technical Advise and Review of Structural Drawings of Heliport Building at KedarnathAjay ChourasiaExecutive Engineer, PWD, Guptkashi, Uttarakhand05-2023 to 12-2025
17Design and detailing of MSME Sensor Fabrication Laboratory at CSIR-CEERI,PilaniChandan Swaroop MeenaCSIR-CEERI,Pilani02-2024 to 11-2025
18Method for Preparing Earthquake Risk Scenarios in States and Uts of India Ajay ChourasiaM/s National Disaster Management Authority (NDMA) Ministry of Home Affairs, Government of India, New Delhi08-2024 to 11-2025
19Vetting of Structural Design and Drawings and Detailed Projects report (DPR) for Construction of 19 Eklavya Model Residential Schools (EMRS)Kishore S KulkarniNational Education Society for Tribal Students (NESTS), Jeevan Tara Building, Parliament Street, New Delhi-11000112-2024 to 10-2025
20Structural Audit of SBI Residential Complex at 14, Kalidas Road Dehradun Hina Gupta M/s Executive Engineer (C-1) Central Public Works Department 20-Subash Road, Dehradun12-2023 to 10-2025
21Testing and Rectification Measures for Cracks in Transfer Structure Raft at Tapovan Vishnugad HPP (4x130MW)Ajay ChourasiaNTPC Ltd., 1038 TVHPP Project, Tapovan Vishnugad Hydro Power Chamoli09-2023 to 10-2025
22Structural Condition Assessment of 119 Residential Buildings of Panipat Thermal Power Station Colony Panipat HaryanaH C Arora M/s Panipat Thermal Power Station, Haryana Power Generation Corporation Limited Panipat Haryana 11-2023 to 10-2025
23Risk Assessment of Towns in Indian Himalyan Region: Uttarakhand and Himachal Pradesh Ajay ChourasiaM/s National Disaster Management Authority (NDMA) Ministry of Home Affairs, Government of India, New Delhi08-2024 to 10-2025
24Fire Performance Assessment of Fire DoorHarpal SinghM/s The Executive Engineer, Health Project Division (Central), PWD (GNCTD) LNJP Hospital, New Delhi-11000211-2024 to 10-2025
25Post earthquake Reconstruction of health sector projects in Nepal: Design and project Management for Reconstruction / Retrofitting of health buildings in earthquake areas of Nepal.Ajay ChourasiaMinistry of external affairs, Government of India, New Delhi08-2020 to 09-2025
26Condition Assessment and Suggestions of Remedial Measures for Completion of Partially Constructed Building Blocks at Kath Bungalow DehradunH.C. AroraM/s Dehradun Smart City, PIU, PWD Dehradun10-2024 to 09-2025
27Health Assessment & Remedial Measures for G+5 Super-Speciality Block of S.P Medical College in Bikaner, Rajasthan R. Siva ChidambaramM/s GM (Projects) HSCC India Ltd., E-6(A), Sector 1, Noida-201301 10-2024 to 09-2025
28Structural Audit for Vertical Extension of Lab Block II (North Wing)Suman KumarM/s Executive Engineer (C-II), CPWD, 20 Subhash Road Dehradun, Telephone Number- 0135-275016412-2024 to 08-2025
29Fire Performance Evaluation of Underdeck Insulation FoamA. Aravind KumarM/s L&T Main Office, IICC (Yashobhoomi) Dwarka, Sector 25, New Delhi09-2024 to 08-2025
30Landslide Mapping, monitoring and early warning using optical imaging drone and geo-integrated rainfall threshold based models along National Highway corridor of Bhagirathi Valley, Uttarakhand, IndiaD. P. KanungoDirector, Indian Institute of Remote Sensing, 4, Kalidas Road, P.B. No. 135, Dehradun-24800108-2022 to 08-2025
31Technical advice and guidance on the safe demolition of the TV Tower at Gangtok SikkimManojit SamantaM/s Prashar Bharti, Doordarshan Bhawan, Golf Green, Kolkata07-2024 to 07-2025
32Mitigation, Recovery & Reconstruction of subsidence zone in Joshimath-A. Safety Assessment of building B. Planning & Design of Prefabricated BuildingsAjay ChourasiaUSDMA Govt. of Uttarakhand, Dehradun12-2024 to 06-2025
33TPQC and Monitoring of Construction of Central University of Gujarat (CUG) Permanent Campus (Phase-I) at VadodaraS. K. SinghCPWD Ex. Engineer & Sr Manager, CUG Project Division, Gram Kundhela, Vadodara, Gujarat01-2023 to 06-2025
34Third Party Quality Assurance of construction work of UPRNNM. M. DalbeheraUP Rajkiya Nirman Nigam Ltd., Saharanpur Unit, Saharanpur07-2023 to 06-2025
35Sub-Surface deformation study and monitoring of Narendra nagar landslide area using acoustic emission sensor systemAshish PippalM/s SSPL-DRDO,New Delhi01-2024 to 06-2025
36Structure Safety and Assessment and Suggestions of Rehabilitation Measures For Police Colony Paharganj, New DelhiK.S. KulkarniCommissioner of police Delhi Police Headquarters, MSO Building, IP Estate, New Delhi01-2024 to 05-2025
37Distress investigation of TG raft foundation and suggestions on remedial measures for Unit 2 at RGTPP, Khedar Hissar, HaryanaManojit SamantaM/s Executive Engineer RGTPP, HPGCL, Khedae, Hissar02-2024 to 05-2025
38Structural Health Assessment and Suggestion of Remedial Measures for NIEPVD Buildings at DehradunH. C. AroraDirector NIEPVD, 116-Rajpur Road, Dehradun-24800102-2025 to 05-2025
39Structural Audit Of 05 Cooling Tower at ONGC Hazira Plant, SuratSiddharth BeheraM/s Office of GM-ERG, Room No. 71, Engineering Resource Group, Administration Building, Oil and Natural Gas Corporation Ltd., (ONGC) Hazira Plant, Surat04-2024 to 10-2025
40Agro Industrial Alkali Activated Composite for Prefabricated Building Elements & 3D Volumetric ConstructionAjay ChourasiaMinistry of Housing and Urban Affairs, Govt. of India, New Delhi-11001104-2022 to 12-2025
41S&T Interventions for buildings, Area Development and Landscaping Work at NTPC-Tapovan Vishnugad Hydro Electric ProjectAshish PippalNTPC LTD, Tapovan Vishnugad HPP Ravigram Joshimath, Uttarakhand04-2023 to 03-2026

Last Updated on April 30, 2025