S. No.Project TitlePI / Co-PISponsoring AgencyDuration
1Technical Textiles as Sustainable Building Materials for Various Structural, and Geotechnical Applications in Construction R. Siva ChidambaramJoint Mission Director (RD & I), NTTM, Ministry of Textiles, New Delhi01-2025 to 09-2027
2Rehabilitation of Heritage Structure and Quality Assessment of Ongoing RCC Structures Construction Work in the Mahakaleshwar Temple ComplexAjay ChourasiaShree Mahakaleshwar Mandir Prabandh Samitee, Ujjain 01-2025 to 12-2025
3Special Inspection/ Audit of Civil, Electrical, Fire Services Work of New Parliament Building at Plot- 118, Parliament House Estate, New Delhi-110001S.K. SinghCentral Vista Project Division-I CPWD New Delhi 12-2024 to 12-2025
4Monitoring, and Assessment of Ground Vibration and Building Distress due to Adjacent Tunneling Work at Village Palli, UttarakhandManojit SamantaM/s UJVNL Lakhwar MPP Dakpatthar, Dehradun12-2024 to 06-2026
5Vetting of Structural Design and Drawings and Detailed Projects report (DPR) for Construction of 19 Eklavya Model Residential Schools (EMRS)Kishore S KulkarniNational Education Society for Tribal Students (NESTS), Jeevan Tara Building, Parliament Street, New Delhi-11000112-2024 to 10-2025
6Mitigation, Recovery & Reconstruction of subsidence zone in Joshimath-A. Safety Assessment of building B. Planning & Design of Prefabricated BuildingsAjay ChourasiaUSDMA Govt. of Uttarakhand, Dehradun12-2024 to 06-2025
7Study on Improvement in Rates and Ratios in Estimation of Gross Value Added Construction for Nagaland State of IndiaKishore S KulkarniDirectorate of Economic and Statistics Nagaland Information Commission Government of Nagaland, Kohima12-2024 to 12-2025
8Structural Audit for Vertical Extension of Lab Block II (North Wing)Suman KumarM/s Executive Engineer (C-II), CPWD, 20 Subhash Road Dehradun, Telephone Number- 0135-275016412-2024 to 08-2025
9Establishment of a center of innovation and manufacturing eco-system in industrial IOT vertical-3: smart structure and structural health monitoring (CBRI Part).S. K. PanigrahiCoordinating Lab: CSIR-CGCRI, Kolkata Dr Somnath Bandyopadhyay, Chief Scientist, CSIR-CGCRI, Kolkata (W.B)04-2022 to 03-2027
10Third Party Quality Assurances (Civil, E&M, Horticulture, Civil & MEP Services and Development Work) and Technical Advice for the work of "Design, Construction, Testing and Commissioning of Office Building with Data Center for Punjab National Bank (excluding Data Centre Work) at Plot No.-84, Sector-18, GurugramS.K. SinghM/s Executive Engineer & Sr Manager & Senior Manager ( C), Gurugram Project Division, CPWD, Pilot No. 84, Sector-18, Gurugram03-2024 to 02-2027
11TPQC and Monitoring of Construction of Central University og Gujarat (CUG) Permanent Campus (Phase-II) at Vadodara SH: Construction of Residential Quarters, Hostels etc.S. K. SinghExecutive Engineer & Sr Manager, CUG Project Division, Gram Khandela, Vadodra, Gujarat11-2023 to 10-2026
12Mainstreaming passive solar heated buildings in Indian Himalayan region: Integrating science with traditional practices to enhance climate resilienceNagesh Babu BalamNational Mission on Himalayan Studies, Scientist-E, Centre for Land & Water Resources Management (CLWRM) GBPNIHE, Kosi-Katarmal, Almora, Uttarakhand08-2023 to 08-2026
13Structural Safety Audit of 34 nos. Eklavya Model Residential Schools (EMRSs)S. K. NegiM/s NESTS, Jeevan Tara Building, New Delhi 07-2024 to 06-2026
14Technical Advice & TPQA of Construction of 100 Bedded ESIC Hospital & 32 Nos. of Staff Quarters with Boundary Walls including Horticulture & all other related services at Bahadurgarh, HaryanaS. K. SinghEx. Engineer, CPWD, NDRI Campus, Near SBI Karnal-132001 Haryana04-2023 to 03-2026
15Technical Advise and Review of Structural Drawings of Heliport Building at KedarnathAjay ChourasiaExecutive Engineer, PWD, Guptkashi, Uttarakhand05-2023 to 12-2025
16Method for Preparing Earthquake Risk Scenarios in States and Uts of India Ajay ChourasiaM/s National Disaster Management Authority (NDMA) Ministry of Home Affairs, Government of India, New Delhi08-2024 to 11-2025
17Testing and Rectification Measures for Cracks in Transfer Structure Raft at Tapovan Vishnugad HPP (4x130MW)Ajay ChourasiaNTPC Ltd., 1038 TVHPP Project, Tapovan Vishnugad Hydro Power Chamoli09-2023 to 10-2025
18Structural Condition Assessment of 119 Residential Buildings of Panipat Thermal Power Station Colony Panipat HaryanaH C Arora M/s Panipat Thermal Power Station, Haryana Power Generation Corporation Limited Panipat Haryana 11-2023 to 10-2025
19Risk Assessment of Towns in Indian Himalyan Region: Uttarakhand and Himachal Pradesh Ajay ChourasiaM/s National Disaster Management Authority (NDMA) Ministry of Home Affairs, Government of India, New Delhi08-2024 to 10-2025
20Fire Performance Assessment of Fire DoorHarpal SinghM/s The Executive Engineer, Health Project Division (Central), PWD (GNCTD) LNJP Hospital, New Delhi-11000211-2024 to 10-2025
21Post earthquake Reconstruction of health sector projects in Nepal: Design and project Management for Reconstruction / Retrofitting of health buildings in earthquake areas of Nepal.Ajay ChourasiaMinistry of external affairs, Government of India, New Delhi08-2020 to 09-2025
22Condition Assessment and Suggestions of Remedial Measures for Completion of Partially Constructed Building Blocks at Kath Bungalow DehradunH.C. AroraM/s Dehradun Smart City, PIU, PWD Dehradun10-2024 to 09-2025
23Health Assessment & Remedial Measures for G+5 Super-Speciality Block of S.P Medical College in Bikaner, Rajasthan R. Siva ChidambaramM/s GM (Projects) HSCC India Ltd., E-6(A), Sector 1, Noida-201301 10-2024 to 09-2025
24Fire Performance Evaluation of Underdeck Insulation FoamA. Aravind KumarM/s L&T Main Office, IICC (Yashobhoomi) Dwarka, Sector 25, New Delhi09-2024 to 08-2025
25Landslide Mapping, monitoring and early warning using optical imaging drone and geo-integrated rainfall threshold based models along National Highway corridor of Bhagirathi Valley, Uttarakhand, IndiaD. P. KanungoDirector, Indian Institute of Remote Sensing, 4, Kalidas Road, P.B. No. 135, Dehradun-24800108-2022 to 08-2025
26Technical advice and guidance on the safe demolition of the TV Tower at Gangtok SikkimManojit SamantaM/s Prashar Bharti, Doordarshan Bhawan, Golf Green, Kolkata07-2024 to 07-2025
27TPQC and Monitoring of Construction of Central University of Gujarat (CUG) Permanent Campus (Phase-I) at VadodaraS. K. SinghCPWD Ex. Engineer & Sr Manager, CUG Project Division, Gram Kundhela, Vadodara, Gujarat01-2023 to 06-2025
28Third Party Quality Assurance of construction work of UPRNNM. M. DalbeheraUP Rajkiya Nirman Nigam Ltd., Saharanpur Unit, Saharanpur07-2023 to 06-2025
29Sub-Surface deformation study and monitoring of Narendra nagar landslide area using acoustic emission sensor systemAshish PippalM/s SSPL-DRDO,New Delhi01-2024 to 06-2025
30Distress investigation of TG raft foundation and suggestions on remedial measures for Unit 2 at RGTPP, Khedar Hissar, HaryanaManojit SamantaM/s Executive Engineer RGTPP, HPGCL, Khedae, Hissar02-2024 to 05-2025
31Post Earthquake Reconstruction of schools in Nepal: Planning, Design and project management for reconstruction / retrofitting of 70 schools and 2 libraries in seven earthquake affected districts of Nepal.Ajay ChourasiaMinistry of external affairs government of India, New Delhi03-2019 to 03-2025
32Seismic Vulnerability Assessment & Retrofit of Health /lifelines Buildings in Himachal Pradesh (INDIA).Ajay ChourasiaDirector cum SPL Secretary (Revenue) Govt. of HP, Shimla.01-2021 to 03-2025
33Third party quality Assurance for Construction of NIT Campus at GOA.S. K. NegiProject Director, GOA Project, Nirman Bhawan, Bambolim, GOA.07-2021 to 03-2025
34Agro Industrial Alkali Activated Composite for Prefabricated Building Elements & 3D Volumetric ConstructionAjay ChourasiaMinistry of Housing and Urban Affairs, Govt. of India, New Delhi-11001104-2022 to 03-2025
35Technical Advice and Vetting of Str. DWG’s of Chintal Sthals and Shiv Udhyan at Kedarnath Dham in Kedarnath Trek and Kedar Valley, Uttarakhand for NSCD (National Science Centre, Delhi)Ajay ChourasiaDirector, NSCD, National Sc. Center Near Gate No. 4, Pragati Maidan, New Delhi04-2023 to 03-2025
36S&T Interventions for buildings, Area Development and Landscaping Work at NTPC-Tapovan Vishnugad Hydro Electric ProjectAshish PippalNTPC LTD, Tapovan Vishnugad HPP Ravigram Joshimath, Uttarakhand04-2023 to 03-2025
37Fire Performance Evaluation Bamboo SamplesA. Aravind KumarM/s Guwahati Airport Project Adani Site Office, New Integrated Terminal Building, SOS Village Road, Opposite to Kiran Shree Grand LGBI Airport, Guwahati04-2024 to 03-2025
38Engineering solution for soil erosion Prevention of Traverses.Anindya PainDirector, CFEES, DRDO, Ministry of Defence, Brig. S.K. Majumdar Road,Timarpur, Delhi-110054,India.03-2022 to 02-2025
39Design and detailing of MSME Sensor Fabrication Laboratory at CSIR-CEERI,PilaniChandan Swaroop MeenaCSIR-CEERI,Pilani02-2024 to 02-2025
40Creation of Centre of Excellence on Conservation of Indian Heritage Structures at CSIR-CBRI RoorkeeDebdutta GhoshDepartment of Science & Technology, Ministry of Science & Technology, Technology Bhavan, New Mehrauli Road, New Delhi-11001601-2021 to 01-2026
41Structure Safety and Assessment and Suggestions of Rehabilitation Measures For Police Colony Paharganj, New DelhiK.S. KulkarniCommissioner of police Delhi Police Headquarters, MSO Building, IP Estate, New Delhi01-2024 to 05-2025
42Distress diagnosis and suggestions for rehabilitation measures of Dwarka Court building.H. C. AroraExecutive Engineer PWD, B-6, NCC Building Safdarjang Enclave, New Delhi- 11002902-2020 to 12-2025

Last Updated on January 31, 2025